B. Entries Based on Characterization of a Project’s Purpose Generating Facility 2 The construction, operation, The construction and operation of a new: decommissioning and abandonment of i. fossil fuel-fired electrical generating (a) a new fossil fuel-fired electrical generating facility with a production capacity of 10 facility with a production capacity of 200 MW MW or more or more; 7 (b) a new [...] Mines and Quarries 16 The construction, operation, The construction and operation of any new stone decommissioning and abandonment of a new quarry or sand/gravel pit, with a production capacity (g) stone quarry or sand or gravel pit, with a of 1 000 000 t/year or more. [...] The expansion, decommissioning or abandonment of 20 The expansion of an existing military base an existing military training area, range or test or military station that would result in an establishment for training or weapons testing that is increase in the area of the military base or outside an existing military base and is to be military station of 50% or more. [...] The expansion of an existing (a) oil refinery, including a heavy oil upgrader, that would result in an increase in input capacity of 50% or more and a total input capacity of 10 000 m3/day or more; (b) facility for the production of liquid petroleum products from coal that would result in an increase in production capacity of 50% or more and a total production capacity of 2 000 m3/day or more; (c)